Services
From analysis to detailed planning - combining different specialisations - innovative solutions for complex situations - multidisciplinary understanding
- Collecting basic data, snow depth analysis, site inspections
- Software-supported avalanche simulation (RAMMS, ELBA +, Lied)
- Hazard zone planning
- Hazard susceptibility maps
- Risk analyses for infrastructure (e.g. roads, railway lines, supply lines, power stations)
- Planning and independent consultation on temporary mitigation measures (e.g. blasting ropeways, individual facilities)
- Planning and independent consultation on permanent mitigation measures (e.g. avalanche protection barriers, dams)
- Avalanche protection concepts
- Documentation required to comply with water, forest or nature conservation laws
- Protection forest restoration, reforestation projects
- Maintenance projects (inspection and restoration of mitigation measures)
- Monitoring and maintenance
- Expert reports
- Security and organisational concepts
- Feasibility studies
- Project management and handling of authority procedures
- Collecting basic data, hydrological calculations, site inspections
- Software-supported simulation of torrents and sediment transport (e.g. TELEMAC 2D / 3D, SISYPHE, TomSed, Hec-Ras, Flo-2D)
- Hazard zone planning
- Hazard susceptibility and risk analysis maps for infrastructure (e.g. roads, railway lines, supply lines, power stations)
- Planning and consultation on mitigation measures
- Documentation required to comply with water, forest or nature conservation laws
- Maintenance projects (inspection and restoration of mitigation measures)
- Expert reports
- Security and organisational concepts
- Monitoring and maintenance
- Project management and handling of authority procedures
- Collecting basic data, hydrological calculations, site inspections
- Software-supported simulation of debris flows
- Planning and consultation on mitigation measures
- Documentation required to comply with water, forest or nature conservation laws
- Expert reports
- Security and organisational concepts
- Monitoring and maintenance
- Project management and handling of authority procedures
- Hazard zone planning
- Preparatory studies
- General projects
- Flood risk management plans
- Planning and consultation on mitigation measures
- Documentation required to comply with water, forest or nature conservation laws
- Inventory of mitigation measures
- Software-supported simulation of rivers and bedload transport (e.g. TELEMAC 2D / 3D and SISYPHE)
- Quantification of the impact of planned or existing projects on the flood discharge of a river
- Project management and handling of authority procedures
- Planning ski runs, ski routes, toboggan runs
- Planning snow-making systems
- Expert reports for ski resorts (e.g. avalanche protection concepts, safety analyses)
- Infiltration of precipitation, planning retention systems
- Project management and handling of authority procedures (especially with respect to national and provincial regulations, environmental impact declarations and assessments)
- Planning hiking trails, forest roads and paths, cross-country skiing trails, parking lots
- Slope and embankment protection
- Terrain modification, agricultural recultivation
- Drainage projects, disposal of rainwater
- Project management and handling of authority procedures
- Tenders of planning and construction services
- Construction supervision
- Site supervision
- Pegging based on GPS survey
- Mass and invoice examination
- Data preparation
- Pegging, mapping, digitisation
- Creating thematic maps
- Research and development (e.g. avalanche test site ‘Snowcatcher Stubai’)
- Technical support of Master’s theses